




{"id":2032,"date":"2008-02-27T00:00:00","date_gmt":"2008-02-27T04:00:00","guid":{"rendered":"http:\/\/www.dominicana-online.org\/?p=2032"},"modified":"2008-02-28T08:13:07","modified_gmt":"2008-02-28T04:13:07","slug":"noti679","status":"publish","type":"post","link":"https:\/\/www.dominicanaonline.org\/en\/noti679\/","title":{"rendered":"Santo Domingo Metro Doing Test Runs"},"content":{"rendered":"<p><BR><br \/>\n<TABLE class=texto width=\"90%\" border=0><br \/>\n<TBODY><br \/>\n<TR><br \/>\n<TD vAlign=top width=70><IMG class=thinborderfloat1 border=0 alt=Metro src=\"\/Portal\/noticias\/metro_presidente_65.jpg\" width=65 height=66><\/TD><br \/>\n<TD vAlign=top width=7><BR><\/TD><br \/>\n<TD class=texto vAlign=top><br \/>\n<P><STRONG>Santo Domingo Metro Doing Test Runs<\/STRONG><br \/>\n<P>The Transport Reform Office (OPRET) began the preparatory stage for the first test run of the Santo Domingo Metro. The test run was conducted in the presence of technicians from Madrid\u2019s Metro. For the first time, this modern system of transportation crossed the Isabela River Bridge with not a single glitch, according to a press release from the President\u2019s Office of Information, Press and Publicity. <BR><br \/>\n<P><\/P><br \/>\n<DIV style=\"MARGIN-BOTTOM: 15px; FONT-SIZE: 16px; FONT-FAMILY: Arial, Helvetica, Georgia; WIDTH: 210px; FLOAT: right; COLOR: #339966; PADDING-BOTTOM: 10px; TEXT-ALIGN: right; MARGIN-LEFT: 10px; MARGIN-TOP: 1px; LINE-HEIGHT: 24px\"><SPAN class=quote style=\"COLOR: blue\">&#8230;Santo Domingo Metro system has 16 stations and that all train cars have been built with the very latest technology. <\/STRONG><\/SPAN><\/DIV><br \/>\n<P>Diandino Pe\u00f1a, Director of OPRET, explained that this test run is part of the preparatory stage and was done under the strict supervision of technicians from Madrid\u2019s Metro system. Test runs will continue at different times throughout the next several days. <\/P><br \/>\n<P><IMG class=thinborderfloat1 border=0 alt=Foro src=\"\/Portal\/noticias\/metro_presidente_500.jpg\" width=500> <\/P><br \/>\n<P><STRONG>Circulation Plan<\/STRONG><\/P>President Leonel Fern\u00e1ndez, First Lady Margarita Cede\u00f1o de Fern\u00e1ndez, government and religious officials, businessmen and legislators participated on Wednesday February 27 in the first \u201cCirculation Plan\u201d of the Santo Domingo Metro which is not yet running.<br \/>\n<P>The successful test run that lasted less than 20 minutes, began at 12:35 p.m. in the Central Station of Los Heroes, near the headquarters of the National Lottery. After the test run, the president went to the National Assembly where he gave a speech about the state of the nation, according to a press release.<br \/>\n<P>Following the 14-kilometer metro ride (the whole length of the system) and having arrived at the first station of \u201cMam\u00e1 Ting\u00f3\u201d, the cars changed direction then traveled several more minutes to the Mirabal Sisters station where the president and his invited guests were met by the rhythm of a single drum.<br \/>\n<P>Prior to the test run, Transit Office (OPRET) Director Diandino Pe\u00f1a, explained that the Santo Domingo Metro system has 16 stations and that all train cars have been built with the very latest technology.<br \/>\n<P><br \/>\n<P><IMG class=thinborderfloat1 border=0 alt=Foro src=\"\/Portal\/noticias\/metrooficial_do_500.jpg\" width=500><br \/>\n<P>&nbsp;<\/P><\/TD><\/TR><br \/>\n<TR><br \/>\n<TD vAlign=top><\/TD><br \/>\n<TD vAlign=top><\/TD><br \/>\n<TD class=texto vAlign=top align=right>Date of Publication: February 28, 2008 <\/TD><\/TR><\/TBODY><\/TABLE><\/p>","protected":false},"excerpt":{"rendered":"<p>Santo Domingo Metro Doing Test Runs The Transport Reform Office (OPRET) began the preparatory stage for the first test run of the Santo Domingo Metro. The test run was conducted in the presence of technicians from Madrid\u2019s Metro. For the first time, this modern system of transportation crossed the Isabela River Bridge with not a &hellip; <a href=\"https:\/\/www.dominicanaonline.org\/en\/noti679\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Santo Domingo Metro Doing Test Runs&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2032","post","type-post","status-publish","format-standard","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/posts\/2032"}],"collection":[{"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/comments?post=2032"}],"version-history":[{"count":0,"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/posts\/2032\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/media?parent=2032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/categories?post=2032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dominicanaonline.org\/en\/wp-json\/wp\/v2\/tags?post=2032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}